Middle School Algebra Projects

Product

Cartoon Last Character Standing Probability Experiment (Best Selling)

By Modified Treasures

Cartoon Last Character Standing

Students will be given a list of Cartoon Characters to see how their characters are eliminated over a 10 day period during the Last Character Standing Games. They will be given a pair of dice that will be used to determine if the character moves on to the next day or if they are eliminated. On the back is a series of questions to ensure that students are learning about experimental probability. Very fun and there will be a lot of laughs.

Click to See More Resources

Math
Algebra
Fractions
$1.00
Product
Product
Product
Product

Deriving the Quadratic Formula, Factoring, Algebra, Mini Project

By Mathologist

The Quadratic Formula, Algebra Mini Project

In this project, students will create a trifold flyer of The Quadratic Formula. The flyer will include:

*Deriving the formula

*Solving an example using the Quadratic Formula

*Coming up with examples.

Students can create this flyer as to teach someone else the lesson on deriving the Quadratic Formula. This project will help students understand the formula and how it was derived. It will also allow students to think and come up with their own examples with answers.

Common Core Standards:

CCSS.MATH.CONTENT.HSA.APR.C.4

CCSS.MATH.CONTENT.HSA.APR.C.5

CCSS.MATH.CONTENT.HSA.REI.A.1

More Algebra resources available:

https://www.TeachShare.com/Store/Mathologist

Math
Algebra
Other (Math)
$3.00
Product
Product
Product
Product

End of Year Algebra 1 Review Project|Escape Room Math Project|High School Math

By AbsoluteValueMath

This Algebra 1 Review Escape Room Project is completely SELF CHECKING and includes 40 questions to Escape from Mathematical Mansion! Students will complete 4 multiple choice questions in each of the 10 rooms covering major algebra 1 topics including linear equations, rational and irrational numbers, inequalities, statistics, system of equations, functions and relations, exponents, factoring, quadratics and rational equations! After they solve the questions they will take their letter answer choice in order and write it under the locked door.

Before they can move to the next room they will go to there LOCK DECODER (Google Sheet) and put their code in. If the box turns green they can move to the next room. If the box turns red they must find their error and try again!

Their FINAL CHALLENGE will be to create their own multiple choice question per topic, which a template is provided for.

** Check the video preview for the book put together **

** ALL QUESTIONS ALIGN TO THE COMMON CORE STANDARDS **

Topics Included:

Room 1: The Library Of Rational & Irrational Numbers

Room 2: The Linear Equations Garden

Room 3: The Cryptic Inequalities Chamber
Room 4: The System Of Equations Parlor
Room 5: The Functions And Relations Den

Room 6: The Exponents Laboratory

Room 7: The Factoring Nook
Room 8: The Quadratic Equation Tower

Room 9: The Rational Equations Gallery

Room 10: The Statistics Study

What is included:

- Cover Page

- Direction Page for students

- Google Sheets Link for LOCK DECODER

- 10 student sheets with 4 multiple choice questions each

- Template for the FINAL CHALLENGE

GREAT FOR:

- End of Year Review

- Extra Credit Project

- Individual Review

- Test Prep (in an engaging way)

You might also like:

Algebra 1 Mystery Project Bundle

Algebra 1 Review Activity Bundle

More Algebra 1 Resources

Let's be friends:

Instagram

My Website

Join my email list so you can get access to my FREE RESOURCE LIBRARY:

My Email List

Follow my store so you get updates on new posted products:

My TeachShare Store

Don't forget to leave a review to get TeachShare credit!

Thank you for being here!

End of Year
Algebra
$3.99
Product
Product
Product
Product

Solving Linear Equations Project | Brochure | Student Choice Project| Algebra 1

By AbsoluteValueMath

In this solving linear equations project, students will be making a brochure to showcase what they know! They will be choosing the question they want to solve in each of the 7 categories so that they can feel successful! Student choice projects have proven to increase student engagement, success and feelings of accomplishment. Fraction and decimal answers included in some questions!

This project is super easy to print and fold and can be used at the end of solving linear equations for your Algebra 1 students or even Pre Algebra students!

See the preview and video preview for a closer look and watch me complete one from beginning to end :)

Topics Included:

- solving one step equations

- solving two step equations

- solving multi-step equations with combining like terms

- solving multi-step equations with distribution

- writing and solving linear equations from a word problem

- writing and solving a multi-step challenge problem

What you get:

- 2 page brochure

- List of 39 questions for students to choose from

- Answer Key

If you would like to, leave a review to get TeachShare credit! :)

Math
Algebra
$2.00
Product
Product
Product
Product

6th Grade Math End of the Year Fun Activities | 6th Grade Math Review Activities

By AbsoluteValueMath

This 6th grade FUN math activity bundle is perfect for the end of the year to review with your 6th graders! Students will be completing a word search, color by number on ratios and proportions, solving a mystery on one step linear equations, completing a cut and paste activity on integer operations and a review worksheet that covers more major 6th grade topics including fractions, percents, area, inequalities, mean and median.

** ALL QUESTIONS ALIGN TO THE COMMON CORE STANDARDS **

Topics Included:

  1. Vocabulary (WORD SEARCH)

- ALGEBRA

- ANGLE

- AREA

- ARITHMETIC

- CIRCLE

- COEFFICIENT

- DENOMINATOR

- DECIMAL

- DIVISION

- EQUATION

- VOLUME

- PERCENT

- SUM

- FRACTION

- GEOMETRY

- INTEGER

- MULTIPLICATION

- NUMERATOR

- PERIMETER

- PROBABILITY

- PROPORTION

- RADIUS

- RATIO

- SURFACE

- VARIABLES

  1. Solving Linear Equations (one step)

  2. Ratio's and Proportions

  3. Integer Operations (addition, subtraction, multiplication, division)

  4. Fractions (adding and subtracting with unlike denominators)

  5. Reducing Fractions

  6. Finding area

  7. Mean and Median

  8. Inequalities

  9. Percents

What is included:

- Word Search with 24 words and a mystery message

- Color by Number with 12 questions

- Color by Number Work Page

- Color by Number Picture

- Cut and Paste with 16 questions

- Mystery Worksheet with 12 questions

- Mystery Worksheet Work Page

- Mystery Worksheet for Unlock Code

- End of Year Math Review Worksheet with 8 questions

GREAT FOR:

- End of Year Review

- Extra Credit Project

- Individual Review

- Test Prep (in an engaging way)

You might also like:

6th Grade Mystery Project

6th Grade Math Project Bundle

Pre-Algebra Mystery Project Bundle

Algebra 1 Review Activity Bundle

More Algebra 1 Resources

Let's be friends:

Instagram

My Website

Join my email list so you can get access to my FREE RESOURCE LIBRARY:

My Email List

Follow my store so you get updates on new posted products:

My TeachShare Store

Don't forget to leave a review to get TeachShare credit!

Thank you for being here!

End of Year
Algebra
$5.00
Product
Product
Product
Product

Algebra 1/PreAlgebra Halloween Escape Room | 8th and 9th Grade Math Escape Room

By AbsoluteValueMath

This Algebra 1/PreAlgebra Math Skills Halloween Escape Room is completely SELF CHECKING (and printable) and includes 40 questions to help Spencer's spirit get free from your school! Students will complete 4 multiple choice questions in each of the 10 rooms covering math skills that are covered in Pre Algebra, including order of operations, linear equations, exponents, GCF, LCM, square roots, decimals, percentages & fractions, the coordinate plan, irregular shapes and simple proportions! After they solve the questions they will take their letter answer choice in order and write it under the locked door.

Before they can move to the next room they will go to the LOCK DECODER (Google Sheet) and put their code in. If the box turns green they can move to the next room. If the box turns red they must find their error and try again!

Their FINAL CHALLENGE will be to create their own multiple choice question per topic, which a template is provided for.

** Check the video preview for a walk through **

Why you need this:

- completely independent & self checking

- halloween story to keep your students intrigued

- will help your students with their basic math skills

- no calculator need (just print this packet)

- it will give them a focused task on a hight energy holiday

Topics Included:

Room 1: The Library of ORDER OF OPERATIONS

Room 2: The LINEAR EQUATIONS Garden

Room 3: The EXPONENTS Chamber

Room 4: The GREATEST COMMON FACTOR Den

Room 5: The SQUARE ROOT Parlor

Room 6: The LEAST COMMON MULTIPLE Laboratory

Room 7: The DECIMALS, PERCENTAGES AND FRACTIONS Nook

Room 8: The COORDINATE PLANE Tower

Room 9: The IRREGULAR SHAPES Gallery

Room 10: The SIMPLE PROPORTIONS Study

What is included:

- Cover Page

- Direction Page for students

- Google Sheets Link for LOCK DECODER

- 10 student sheets with 4 multiple choice questions each

- Template for the FINAL CHALLENGE

GREAT FOR:

- Math Skills Review

- Extra Credit Project

- Individual Review

- Test Prep (in an engaging way)

You might also like:

Algebra 1 Mystery Project Bundle

Algebra 1 Review Activity Bundle

More Algebra 1 Resources

Let's be friends:

Instagram

My Website

Join my email list so you can get access to my FREE RESOURCE LIBRARY:

My Email List

Follow my store so you get updates on new posted products:

My TeachShare Store

Don't forget to leave a review to get TeachShare credit!

Thank you for being here!

Halloween
Math
Algebra
$4.00
Product
Product
Product
Product

Algebra 1 Review Project | Review Activity | High School | Clue Mystery Game

By AbsoluteValueMath

This Algebra 1 Review Project includes 64 questions to Solve the Mystery of the Missing.... WE HAVE TO FIND OUT! Students will complete 8 Clue Sheets covering major algebra 1 topics including exponents, factoring, systems of equations, polynomials & linear functions! After they solve the questions they will discover one answer was not used. Whatever is next to that answer is the answer to that part of the mystery.

After they discover who took what with what to who (and more) they will fill in the blanks of a story and create their own book cover! This review activity has been created with Algebra 1 level questions but will keep your students engaged and excited.

RUBRIC INCLUDED!

Check out the preview video to see the book put together!

This is the FIRST in a SERIES of Mystery Books so hang around for the next one! If you like this one don't forget to let me know below! :)

What is included:

- Blank cover page for students to decorate after the mystery is solved

- Table of Contents

- Fill in the Blank story

- 8 Clue Sheets (with 8 questions each)

- Answer Key

GREAT FOR:

- End of Year Review

- Extra Credit Project

- Individual Review

- Test Prep (in an engaging way)

You might also like:

Algebra 1 Review Activity Bundle

More Algebra 1 Resources

Let's be friends:

Instagram

My Website

Join my email list so you can get access to my FREE RESOURCE LIBRARY:

My Email List

Follow my store so you get updates on new posted products:

My TeachShare Store

Don't forget to leave a review to get TeachShare credit!

Thank you for being here!

End of Year
Algebra
$5.00
Product
Product
Product
Product

2 Variable System of Equations Project | Independent No Prep Algebra 1 Project

By AbsoluteValueMath

This 2 Variable Systems of Equations Mystery Project will have your students excited to review substitution, elimination and system of equations word problems. There is a printable and digital version of this project included! They will be solving 36 questions involving systems of equations. They will get 6 clue sheets with 6 questions on each sheet. The answer choice leftover is the answer to that part of the mystery. They will fill in a storyline with their clues to see the whole mystery come together!

This project is the perfect print and go activity OR digital that will take 2-3 days to complete! There is a rubric included, student direction card and an answer key. Grading couldn't be more simple.

Digital Version:

- your students will get a google slide link with the project pages embedded in the background. They will solve the questions and type their answers in the already given text boxes and then drag a semi-transparent box over the final answer to each clue.

Check out my preview for a closer look and the video preview to see the digital version!

Topics Covered:

Clue 1: Substitution (Level 1)

Clue 2: Substitution (Level 2)

Clue 3: Elimination (Level 1)

Clue 4: Elimination (Level 2)

Clue 5: Word Problems (Coins)

Clue 6: Word Problems (Money)

What do I get in this product?

- 6 Clue Sheets with 6 questions on each sheet that answer the questions:

  • What was stolen?
  • Who took it?
  • When did they take it?
  • Where did they hide it?
  • Who was their accomplice?
  • Why did they take it?

- A student workspace booklet

- Fill in the blank storyline

- Cover to decorate for your Mystery Project

- Rubric

- Student Direction Card

- Digital Google Slides version

- Answer Key

Products you might like:

MORE ALGEBRA 1 MYSTERY PROJECTS

MORE PRE-ALGEBRA MYSTERY PROJECTS

Let's be friends:

Instagram

Facebook Group

My Website

Join my email list so you can get access to my FREE RESOURCE LIBRARY:

My Email List

Follow my store so you get updates on new posted products:

My TeachShare Store

Don't forget to leave a review to get TeachShare credit!

Thank you for being here!

Math
Algebra
$5.00
Product
Product
Product
Product

End of Year Pre Algebra Digital Escape Room Project | Self Checking Math Project

By AbsoluteValueMath

This Pre Algebra Digital Escape Room Project is completely SELF CHECKING and includes 40 questions to Escape from Mathematical Mansion! Students will complete 4 multiple choice questions in each of the 10 rooms covering major algebra 1 topics including signed numbers, linear equations, inequalities, system of equations, rate of change, exponents, order of operations, distribution and pythagorean theorem! After they solve the questions they will take their letter answer choice in order and write it in the google form.

Before they can move to the next room they must get the code correct! If it is wrong a message will display that says "SORRY! TRY AGAIN!" They. must figure out where the error is to move forward.

Their FINAL CHALLENGE will be to create their own multiple choice question per topic, which a template is provided for.

** This is the DIGITAL VERSION of my End of Year Pre Algebra Review Project|Escape Room Math Project| Middle School **

** ALL QUESTIONS ALIGN TO THE COMMON CORE STANDARDS **

Topics Included:

Room 1: The Library Of Signed Numbers

Room 2: The Linear Equations Garden

Room 3: The Cryptic Inequalities Chamber
Room 4: The System Of Equations Parlor
Room 5: The Rate of Change Den

Room 6: The Exponents Laboratory

Room 7: The Linear or Not Linear Nook
Room 8: The Order of Operations Tower

Room 9: The Distribution Gallery

Room 10: The Pythagorean Theorem Study

What is included:

- Cover Page

- Google Form Escape Room

- 10 student sheets with workspace

- Template for the FINAL CHALLENGE

GREAT FOR:

- End of Year Review

- Extra Credit Project

- Individual Review

- Test Prep (in an engaging way)

You might also like:

Algebra 1 Mystery Project Bundle

Algebra 1 Review Activity Bundle

More Algebra 1 Resources

Let's be friends:

Instagram

My Website

Join my email list so you can get access to my FREE RESOURCE LIBRARY:

My Email List

Follow my store so you get updates on new posted products:

My TeachShare Store

Don't forget to leave a review to get TeachShare credit!

Thank you for being here!

End of Year
Algebra
$3.99
Product
Product
Product
Product

Algebra 1 Thanksgiving Self Checking Printable Escape Room | No Prep

By AbsoluteValueMath

This Algebra 1 Thanksgiving Escape Room is completely SELF CHECKING (and printable) and includes 40 questions to help solve the mystery of the missing thanksgiving dinner items! Students will complete 4 multiple choice questions in each of the 10 rooms covering math skills that are covered in Algebra 1, including order of operations, linear equations, exponents, GCF, Square Roots, evaluating expressions, inequalities, distributive property, combining like terms, and linear proportions. After they solve the questions they will take their letter answer choice in order and write it under the locked door.

Before they can move to the next room they will go to the LOCK DECODER (Google Sheet) and put their code in. If the box turns green they can move to the next room. If the box turns red they must find their error and try again!

Their FINAL CHALLENGE will be to create their own multiple choice question per topic, which a template is provided for.

** Check the video preview for a walk through **

Why you need this:

- completely independent & self checking

- thanksgiving story to keep your students intrigued

- will help your students with their basic math skills

- no calculator needed (just print this packet)

- it will give them a focused task on a high energy holiday

Topics Included:

Room 1: The Library of ORDER OF OPERATIONS

Room 2: The LINEAR EQUATIONS Garden

Room 3: The EXPONENTS Chamber

Room 4: The GREATEST COMMON FACTOR Den

Room 5: The SQUARE ROOT Parlor

Room 6: The EVALUATING EXPRESSIONS Laboratory

Room 7: The INEQUALITIES Nook

Room 8: The DISTRIBUTION PROPERTY Tower

Room 9: The COMBINING LIKE TERMS Gallery

Room 10: The LINEAR PROPORTIONS Study

What is included:

- Cover Page

- Direction Page for students

- Google Sheets Link for LOCK DECODER

- 10 student sheets with 4 multiple choice questions each

- Template for the FINAL CHALLENGE

GREAT FOR:

- Math Skills Review

- Extra Credit Project

- Individual Review

- Test Prep (in an engaging way)

You might also like:

Algebra 1 Mystery Project Bundle

Algebra 1 Review Activity Bundle

More Algebra 1 Resources

Let's be friends:

Instagram

My Website

Join my email list so you can get access to my FREE RESOURCE LIBRARY:

My Email List

Follow my store so you get updates on new posted products:

My TeachShare Store

Don't forget to leave a review to get TeachShare credit!

Thank you for being here!

Thanksgiving
Math
Algebra
$4.00
Product
Product
Product
Product

Foundations of Algebra Mystery Review Project | Algebra Basics | Algebra Skills

By AbsoluteValueMath

This Foundations of Algebra Mystery Project will have your students excited to review their basic algebra skills! They will be solving 36 questions involving basic algebra skills. They will get 6 clue sheets with 6 questions on each sheet. The answer choice leftover is the answer to that part of the mystery. They will fill in a storyline with their clues to see the whole mystery come together!

This project is the perfect print and go activity! There is a rubric included and an answer key. Grading couldn't be more simple.

Check out my preview for a closer look!

Topics Covered:

Clue 1: Order of Operations

Clue 2: Combining Like Terms

Clue 3: Solving 1 and 2 step linear equations

Clue 4: Evaluating Algebraic Expressions

Clue 5: Verbal Expressions to Algebraic Expressions

Clue 6: Equivalent Expressions

What you get:

  1. 6 Clue Sheets with 6 questions on each sheet that answer the questions:

-What was stolen?

-Who took it?

-When did they take it?

-Where did they hide it?

-Who was their accomplice?

-Why did they take it?

  1. A student workspace booklet

  2. Fill in the blank storyline

  3. Cover to decorate for your Mystery Project

  4. Rubric

  5. Answer Key

Products you might like:

MORE ALGEBRA 1 MYSTERY PROJECTS

MORE PRE-ALGEBRA MYSTERY PROJECTS

Let's be friends:

Instagram

Facebook Group

My Website

Join my email list so you can get access to my FREE RESOURCE LIBRARY:

My Email List

Follow my store so you get updates on new posted products:

My TeachShare Store

Don't forget to leave a review to get TeachShare credit!

Thank you for being here!

Math
Algebra
$5.00
Product
Product
Product
Product

Algebra 1 Christmas Self Checking Printable Escape Room | No Prep Activity

By AbsoluteValueMath

This Algebra 1 Christm Escape Room is completely SELF CHECKING (and printable) and includes 40 questions to help solve the mystery of the missing thanksgiving dinner items! Students will complete 4 multiple choice questions in each of the 10 rooms covering math skills that are covered in Algebra 1, including order of operations, linear equations, exponents, GCF, Square Roots, evaluating expressions, inequalities, distributive property, combining like terms, and linear proportions. After they solve the questions they will take their letter answer choice in order and write it under the locked door.

Before they can move to the next room they will go to the LOCK DECODER (Google Sheet) and put their code in. If the box turns green they can move to the next room. If the box turns red they must find their error and try again!

Their FINAL CHALLENGE will be to create their own multiple choice question per topic, which a template is provided for.

** Check the preview for a closer look! **

Why you need this:

- completely independent & self checking

- christmas story to keep your students intrigued

- will help your students with their basic math skills

- no calculator needed (just print this packet)

- it will give them a focused task on a high energy holiday

Topics Included:

Room 1: The Library of ORDER OF OPERATIONS

Room 2: The LINEAR EQUATIONS Garden

Room 3: The EXPONENTS Chamber

Room 4: The GREATEST COMMON FACTOR Den

Room 5: The SQUARE ROOT Parlor

Room 6: The EVALUATING EXPRESSIONS Laboratory

Room 7: The INEQUALITIES Nook

Room 8: The DISTRIBUTION PROPERTY Tower

Room 9: The COMBINING LIKE TERMS Gallery

Room 10: The LINEAR PROPORTIONS Study

What is included:

- Cover Page

- Direction Page for students

- Google Sheets Link for LOCK DECODER

- 10 student sheets with 4 multiple choice questions each

- Template for the FINAL CHALLENGE

GREAT FOR:

- Math Skills Review

- Extra Credit Project

- Individual Review

- Test Prep (in an engaging way)

You might also like:

Algebra 1 Mystery Project Bundle

Algebra 1 Review Activity Bundle

More Algebra 1 Resources

Let's be friends:

Instagram

My Website

Join my email list so you can get access to my FREE RESOURCE LIBRARY:

My Email List

Follow my store so you get updates on new posted products:

My TeachShare Store

Don't forget to leave a review to get TeachShare credit!

Thank you for being here!

Christmas/ Chanukah/ Kwanzaa
Math
Algebra
$4.00
Product
Product
Product
Product

Fun Summer Themed Middle School Math Activities | Math Coloring | End of Year

By AbsoluteValueMath

This middle school math summer themed activity bundle contains 6 summer themed activities is the perfect way to end the year for 6th, 7th or 8th grade math students! They will be completing a color by number, scavenger hunt to collect summer vacation items, planning a summer picnic, completing a maze to figure out what items they are bringing on summer vacation and which they have to buy. They will also be giving advice to next years math students and playing "Find Someone Who" to see what their friends are doing this summer!

** ALL QUESTIONS ALIGN TO THE COMMON CORE STANDARDS **

Review Topics Included:

  1. Percentages

  2. Fractions (all operations)

  3. Ratios & Proportions

  4. Mean

  5. Order of Operations

  6. Budgeting

  7. Area

  8. Perimeter

  9. Number Properties

  10. Solving one step Linear Equations

  11. Converting decimals, fractions and percents

  12. Exponents

What is included:

- Advice to Next Years Students

- Color by Number (9 questions) with a corresponding picture

- Plan a picnic and stay within budget (including calculating tax)

- Find someone who..summer edition

- Fraction Scavenger Hunt

- Order of Operations Maze

- Answer Keys

GREAT FOR:

- End of Year Review

- Extra Credit

- Last Couple Days of School

- Test Prep (in an engaging way)

You might also like:

6th Grade Mystery Project

6th Grade Math Project Bundle

More Middle School End of Year Activities

Let's be friends:

Instagram

My Website

Join my email list so you can get access to my FREE RESOURCE LIBRARY:

My Email List

Follow my store so you get updates on new posted products:

My TeachShare Store

Don't forget to leave a review to get TeachShare credit!

Thank you for being here!

End of Year
Summer
Algebra
$5.00
Product
Product
Product
Product

6th Grade Math Escape Room | 6th Grade Math Project | End of Year Review

By AbsoluteValueMath

This 6th grade math escape room is a great end of year review project that is completely SELF CHECKING and includes 40 questions to Escape from Mathematical Mansion! Students will complete 4 multiple choice questions in each of the 10 rooms covering major 6th grade topics including signed numbers, operations with fractions, greatest common factor, number properties, linear equations, mean, median, mode, surface area and proportions! After they solve the questions they will take their letter answer choice in order and write it under the locked door.

Before they can move to the next room they will go to there LOCK DECODER (Google Sheet) and put their code in. If the box turns green they can move to the next room. If the box turns red they must find their error and try again!

Their FINAL CHALLENGE will be to create their own multiple choice question per topic, which a template is provided for.

** Check the video preview for the book put together **

** ALL QUESTIONS ALIGN TO THE COMMON CORE STANDARDS **

Topics Included:

Room 1: The Library of SIGNED NUMBERS

Room 2: The ADDING FRACTIONS Garden

Room 3: The SUBTRACTING FRACTIONS Chamber

Room 4: The GREATEST COMMON FACTOR Parlor

Room 5: The NUMBER PROPERTIES Den

Room 6: The LINEAR EQUATIONS Laboratory

Room 7: The MEAN, MEDIAN AND MODE Nook

Room 8: The MULTIPLYING & DIVIDING FRACTIONS Tower

Room 9: The AREA AND SURFACE AREA Gallery

Room 10: The PROPORTIONS Study

What is included:

- Cover Page

- Direction Page for students

- Google Sheets Link for LOCK DECODER

- 10 student sheets with 4 multiple choice questions each

- Template for the FINAL CHALLENGE

GREAT FOR:

- End of Year Review

- Extra Credit Project

- Individual Review

- Test Prep (in an engaging way)

You might also like:

6th Grade Mystery Project

Pre-Algebra Mystery Project Bundle

Algebra 1 Review Activity Bundle

More Algebra 1 Resources

Let's be friends:

Instagram

My Website

Join my email list so you can get access to my FREE RESOURCE LIBRARY:

My Email List

Follow my store so you get updates on new posted products:

My TeachShare Store

Don't forget to leave a review to get TeachShare credit!

Thank you for being here!

End of Year
Algebra
$3.99
Product
Product
Product
Product

End of Year Algebra 1 Digital Escape Room Project | Self Checking Math Project

By AbsoluteValueMath

This Algebra 1 Digital Escape Room Project is completely SELF CHECKING and includes 40 questions to Escape from Mathematical Mansion! Students will complete 4 multiple choice questions in each of the 10 rooms covering major algebra 1 topics including linear equations, rational and irrational numbers, inequalities, statistics, system of equations, functions and relations, exponents, factoring, quadratics and rational equations! After they solve the questions they will take their letter answer choice in order and write it in the google form.

Before they can move to the next room they must get the code correct! If it is wrong a message will display that says "SORRY! TRY AGAIN!" They. must figure out where the error is to move forward.

Their FINAL CHALLENGE will be to create their own multiple choice question per topic, which a template is provided for.

** Check the video preview for the work book put together **

** This is the DIGITAL VERSION of my End of Year Algebra 1 Review Project|Escape Room Math Project|High School Math **

** ALL QUESTIONS ALIGN TO THE COMMON CORE STANDARDS **

Topics Included:

Room 1: The Library Of Rational & Irrational Numbers

Room 2: The Linear Equations Garden

Room 3: The Cryptic Inequalities Chamber
Room 4: The System Of Equations Parlor
Room 5: The Functions And Relations Den

Room 6: The Exponents Laboratory

Room 7: The Factoring Nook
Room 8: The Quadratic Equation Tower

Room 9: The Rational Equations Gallery

Room 10: The Statistics Study

What is included:

- Cover Page

- Google Form Escape Room

- 10 student sheets with workspace

- Template for the FINAL CHALLENGE

GREAT FOR:

- End of Year Review

- Extra Credit Project

- Individual Review

- Test Prep (in an engaging way)

You might also like:

Algebra 1 Mystery Project Bundle

Algebra 1 Review Activity Bundle

More Algebra 1 Resources

Let's be friends:

Instagram

My Website

Join my email list so you can get access to my FREE RESOURCE LIBRARY:

My Email List

Follow my store so you get updates on new posted products:

My TeachShare Store

Don't forget to leave a review to get TeachShare credit!

Thank you for being here!

End of Year
Algebra
$3.99
Product
Product
Product
Product

7th Grade Math End of Year Review | 7th Grade Math Project | Mystery Activity

By AbsoluteValueMath

This 7th grade math end of year activity includes 64 questions to Solve the Mystery of the Missing.... WE HAVE TO FIND OUT! Students will complete 8 Clue Sheets covering major 7th grade topics including ratios, proportional relationships, the number system, simplifying expressions, equations, area/volume, inequalities and probability ! After they solve the questions they will discover one answer was not used. Whatever is next to that answer is the answer to that part of the mystery.

After they discover who took what with what to who (and more) they will fill in the blanks of a story and create their own book cover! This review activity has been created with 7th grade level questions but will keep your students engaged and excited.

RUBRIC INCLUDED!

Check out the preview video to see how it is used!

What is included:

- Blank cover page for students to decorate after the mystery is solved

- Table of Contents

- Fill in the Blank story

- 8 Clue Sheets (with 8 questions each)

- Answer Key

GREAT FOR:

- End of Year Review

- Extra Credit Project

- Individual Review

- Test Prep (in an engaging way)

You might also like:

Pre-Algebra Activities

Let's be friends:

Instagram

My Website

Join my email list so you can get access to my FREE RESOURCE LIBRARY:

My Email List

Follow my store so you get updates on new posted products:

My TeachShare Store

Don't forget to leave a review to get TeachShare credit!

Thank you for being here!

End of Year
Algebra
$3.99
Product
Product
Product
Product

Algebra 1 Review Project | Review Activity | High School | Clue Mystery Game

By AbsoluteValueMath

This Algebra 1 Review Project BOOK TWO includes 64 questions to Solve the Mystery of the Missing.... WE HAVE TO FIND OUT! Students will complete 8 Clue Sheets covering major algebra 1 topics including inequalities, multiplying polynomials, solving quadratics, average rate of change, two way tables, arithmetic sequences, consecutive integer word problems and statistics! After they solve the questions they will discover one answer was not used. Whatever is next to that answer is the answer to that part of the mystery.

After they discover who took what with what to who (and more) they will fill in the blanks of a story and create their own book cover! This review activity has been created with Algebra 1 level questions but will keep your students engaged and excited.

** ALL QUESTIONS ALIGN TO THE COMMON CORE STANDARDS **

RUBRIC INCLUDED!

This is the SECOND in a SERIES of Mystery Books so hang around for the next ones! If you like this one don't forget to let me know below! :)

Topics Included:

  1. Solving Inequalities (with some sign switches)

  2. Multiplying Polynomials

  3. Solving Quadratic Equations (with factoring or quadratic formula)

  4. Average Rate of Change (from a graph)

  5. Two Way Tables (finding percentages with conditional probability)

  6. Arithmetic Sequence

  7. Consecutive Integer Word Problems

  8. Statistics (Q1, Q3, and IQR)

What is included:

- Blank cover page for students to decorate after the mystery is solved

- Table of Contents

- Fill in the Blank story

- 8 Clue Sheets (with 8 questions each)

- Answer Key

GREAT FOR:

- End of Year Review

- Extra Credit Project

- Individual Review

- Test Prep (in an engaging way)

You might also like:

Algebra 1 Review Mystery Project BOOK ONE

Algebra 1 Review Activity Bundle

More Algebra 1 Resources

Let's be friends:

Instagram

My Website

Join my email list so you can get access to my FREE RESOURCE LIBRARY:

My Email List

Follow my store so you get updates on new posted products:

My TeachShare Store

Don't forget to leave a review to get TeachShare credit!

Thank you for being here!

End of Year
Algebra
$5.00
Product
Product
Product
Product

8th Grade Math End of Year Activities | Scavenger Hunt | Math Puzzles | Coloring

By AbsoluteValueMath

This 8th grade math review is great to review 8th Grade Math end of year with these 5 activities! They are all print and go with very minimal prep for you! Your students will be solving linear equations with a color by number, finding slope in a scavenger hunt, solving systems of equations with a "stack the cards" activity, completing math puzzles and giving advice to next years students on how they can succeed in your class!

** ALL QUESTIONS ALIGN TO THE COMMON CORE STANDARDS **

Review Topics Included:

  1. Solving Linear Equations with Distribution

  2. Solving System of Equations (graphically, substitution and elimination)

  3. Finding Slope (from an equation, points and a graph)

What is included:

- Advice to Next Years Students

- Color by Number (12 questions)

- Scavenger Hunt (12 questions)

- Stack the Cards Activity (12 questions)

- Math puzzles

GREAT FOR:

- End of Year Review

- Extra Credit

- Last Couple Days of School

- Test Prep (in an engaging way)

You might also like:

More Middle School End of Year Activities

Let's be friends:

Instagram

My Website

Join my email list so you can get access to my FREE RESOURCE LIBRARY:

My Email List

Follow my store so you get updates on new posted products:

My TeachShare Store

Don't forget to leave a review to get TeachShare credit!

Thank you for being here!

End of Year
Summer
Algebra
$5.00
Product
Product
Product
Product

7th Grade Math Escape Room | 7th Grade Math Project | End of Year Review

By AbsoluteValueMath

This 7th grade math escape room is a great end of year review project that is completely SELF CHECKING and includes 40 questions to Escape from Mathematical Mansion! Students will complete 4 multiple choice questions in each of the 10 rooms covering major 7th grade topics including signed numbers, operations with fractions, greatest common factor, number properties, linear equations, mean, median, mode, surface area and proportions! After they solve the questions they will take their letter answer choice in order and write it under the locked door.

Before they can move to the next room they will go to there LOCK DECODER (Google Sheet) and put their code in. If the box turns green they can move to the next room. If the box turns red they must find their error and try again!

Their FINAL CHALLENGE will be to create their own multiple choice question per topic, which a template is provided for.

** Check the video preview for the book put together **

** ALL QUESTIONS ALIGN TO THE COMMON CORE STANDARDS **

Topics Included:

Room 1: The Library of SIGNED NUMBERS

Room 2: The ADDING FRACTIONS Garden

Room 3: The SUBTRACTING FRACTIONS Chamber

Room 4: The GREATEST COMMON FACTOR Parlor

Room 5: The NUMBER PROPERTIES Den

Room 6: The LINEAR EQUATIONS Laboratory

Room 7: The MEAN, MEDIAN AND MODE Nook

Room 8: The MULTIPLYING & DIVIDING FRACTIONS Tower

Room 9: The AREA AND SURFACE AREA Gallery

Room 10: The PROPORTIONS Study

What is included:

- Cover Page

- Direction Page for students

- Google Sheets Link for LOCK DECODER

- 10 student sheets with 4 multiple choice questions each

- Template for the FINAL CHALLENGE

GREAT FOR:

- End of Year Review

- Extra Credit Project

- Individual Review

- Test Prep (in an engaging way)

You might also like:

Pre-Algebra Mystery Project Bundle

Algebra 1 Review Activity Bundle

More Algebra 1 Resources

Let's be friends:

Instagram

My Website

Join my email list so you can get access to my FREE RESOURCE LIBRARY:

My Email List

Follow my store so you get updates on new posted products:

My TeachShare Store

Don't forget to leave a review to get TeachShare credit!

Thank you for being here!

End of Year
Algebra
$3.99
Product
Product
Product
Product

Laws of Exponents Student Choice Project | Exponent Rules Reference Sheet

By AbsoluteValueMath

In this Laws of Exponents Student Choice Project, students will be making a booklet to showcase what they know! They will be choosing the question they want to solve in each of the 12 categories so that they can feel successful! They will be completing questions for the product rule, quotient rule, power rule and negative exponent rule. Student choice projects have proven to increase student engagement, success and feelings of accomplishment.

Bonus Reference Sheet with explanations and examples for each rule included!

My favorite part of the whole project is the critical thinking portion where students create their own problems to get them towards to a specified (chosen) solution!

This project is super easy to print and fold and can be used at the end of your exponents unit for your Algebra 1 students or even Pre Algebra students!

See the preview for a closer look!

Topics Included:

- Product Rule

- Quotient Rule

- Power Rule

- Negative Exponent Rule

- Critical Thinking with creating their own problems to end at a specified solution

What you get:

- 2 page booklet

- List of 60 questions for students to choose from

- 2 page thorough reference sheet

- Answer Key

If you would like to, leave a review to get TeachShare credit! :)

Math
Algebra
$3.00